First, we removed the old driveway and disposed of the tree that grew in the middle. Then we designed a new wider layout and put down a hardcore foundation with block paving edges set in concrete. We topped the base with a layer of tarmac and compacted it down.
Finally, we applied a top layer of resin-bound aggregate.